From modular cells to a flexible paced assembly line: produce more without expanding the factory

A French manufacturer of warehouse logistics robots had to multiply its volumes by nearly four by 2030 and consolidate production in a new building. Its modular cell-based assembly, effective at the start, could no longer keep up: long cycle times, heavy reliance on technicians, large floor footprint, under-utilized workshop (TCUP ≈ 53% in 2026). The design study for a flexible paced assembly line — Design Optimizer mission — defined a quantified target model: produce more, on less space, with a much wider cadence range. The first gain is space.

Secteur

Thermal equipment — brazed heat exchangers

Profil entreprise

Fast-growing mid-sized industrial company: business doubled in 4 years

Mission


Enjeu

Validate the layout choices for a new unit before committing to a €30–40M investment

CE CAS

COUS

CONCERNE

SI

QUE

POUVEZ

VOUS

EN

ATTENDRE

RÉSUMÉ

…

CONTEXTE

OBJECTIFS

MÉTHODES

RESULTS YOU CAN EXPECT